Verify

Please check your mobile phone

At The Assembly Hub we value your privacy. Please type in the pin code sent to your mobile number below to confirm your identity.

WRONG CODE!

Resend pin code

Change phone

Download Brochure

An opportunity not to be missed

Register your details to access the brochure and site plans.

Premium industrial hub on the South side of Brisbane

Architecturally designed warehouses from $699k* ready to occupy now. Tailored for trades, e-commerce, and logistics in a prime location.

REMAINING SIZES

Warehouses from 137m² to 315m²

AMPLE PARKING

2-6 carparks per unit

PRIME LOCATION

28 minutes to Brisbane CBD

Units ready to occupy now

Construction Complete

Download Brochure

Premium warehouses

now complete

THE ASSEMBLY

18-24 LOAM STREET, ACACIA RIDGE QLD 4110

3 mins

Beaudesert road

3 mins

Rail Marshalling yards

4 mins

Archerfield airport

8 mins

Ipswitch motorway

14 mins

Rocklea markets

15 mins

Logan motorway

15 mins

Pacific motorway

28 mins

Brisbane CBD

35 mins

Brisbane airport

40 mins

Port of Brisbane

Important legal disclaimer:
The development is in the planning stage only. The photos in this website are indicative only. Final product may differ from that depicted. Furniture and fittings not included. Neither the developer nor any of its contractors or agents make any representation or give any warranty in relation to the size, configuration, location, quality or appearance of any residence or that any particular view will be available from any residence. All aspects of the development are subject to change without notice. To the extent permitted by law, all liability is disclaimed. Interested persons should make and rely on their own enquiries and refer to the contract and associated documents.
In accessing this website, viewers agree that they do so at their own risk. No warranty is given or representation made that this website or the server that operates it is free from viruses or other corrupted materials or that occasional outages or disruptions to service will not occur or that use of this Website will be compatible with the hardware and software used to access it.

Initial yields
estimated to exceed 5%

The Assembly is now complete,

secure your warehouse today,

 final opportunities remain

Ready to occupy today in Brisbane’s southside hub.

Download Brochure